
Cross-border rail corridor upgrade
Full electrification of a 140 km regional link with regenerative braking that returns up to 25% of traction energy to the grid, ETCS Level 2 signalling and station modernisations powered by on-site solar canopies — cutting corridor emissions by an estimated 60%.





